Zero-downtime plansData center roofing · San Antonio, TX
Leak prevention, maintenance and replacement for data centers and critical facilities, documented and planned under your change-control process.
※ The short answer
CRSA is a San Antonio commercial roofing contractor for data centers and mission-critical facilities. We maintain, repair and replace TPO, PVC and metal roofs over live white space across Bexar and surrounding counties, work under your change-control and access procedures with written methods of procedure, log every penetration and answer a live 24/7 leak line.
PMReviewed by our project team, critical facility projects
Critical facilities we roof (building types)
Over a data center, the roof is part of uptime. These habits fit how critical facilities are run.
Every job has a method of procedure that fits your change-control process.
Background checks, escorts and badge procedures handled before day one.
Scheduled inspections find problems before water reaches the white space.
No dust or debris near intakes; work timed with your facilities team.
New conduit and equipment penetrations flashed and recorded.
A live person 24/7 and a crew on site within 4 hours.
From quarterly inspections to a full re-roof over live white space.
Live 24/7 line, crew on site within 4 hours and immediate protection over critical rooms.
Quarterly or semi-annual inspections, drain clearing and a penetration log.
Zones closed daily, with redundant protection under every open area.
New penetrations for chillers, generators and conduit flashed to detail.
Thicker membranes and cover boards that survive large hail.
Pre-storm checks and post-storm inspections with reports.
Pick a system to see how it protects equipment that cannot get wet.
Our usual pick over data halls
Why it fits: Welded seams, strong puncture resistance and excellent detailing around dense equipment.
Watch out: Higher cost; worth it where downtime costs far more than the roof.
Value pick with heavy-duty specs
Why it fits: An 80-mil sheet over a high-density cover board resists hail and traffic.
Watch out: Spec matters: thin sheets without cover boards puncture easily.
For metal-roofed critical buildings
Standing-seam metal roofing details
Why it fits: Concealed fasteners and decades of life with very little maintenance.
Watch out: Needs slope; penetrations need engineered curbs.
For redundancy in two or three plies
Modified bitumen roofing details
Why it fits: Multiple plies add a layer of protection if the top surface is damaged.
Watch out: Avoid torch work; use cold or self-adhered over critical rooms.
Extends a sound roof with no tear-off
Why it fits: No tear-off over live white space and a cooler roof surface.
Watch out: Only on dry roofs; confirmed with a moisture scan.
Every critical facility project follows the same six steps, under your change-control process.
Data halls, MEP rooms and intakes mapped under every roof area.
Step-by-step method of procedure with rollback and emergency plans.
Badges, escorts and change tickets approved before work.
Two layers of protection under any open zone, plus monitoring.
Each step done in its approved window, closed watertight the same day.
Penetration log, photos, warranty and maintenance plan.
A typical day on a critical roof
Planned aroundyour change windows
Six roles approve or feel roof work at a critical site.
Role 01
Scope, MOPs and schedule.
Named contact on our sideRole 02
Change tickets and approved windows.
Named contact on our sideRole 03
Badges, escorts and access.
Named contact on our sideRole 04
Air handlers, chillers and generators.
Named contact on our sideRole 05
Notices for colocation tenants.
Named contact on our sideRole 06
Documentation and storm reports.
Named contact on our sideSample 2026 ranges for the San Antonio area. Critical sites add protection, escorts and documentation, shown separately.
Critical facility line items we show separately
Quarterly inspections cost little next to one leak over a data hall.
80-mil membranes and cover boards resist the hail San Antonio gets.
Most critical-site leaks start where new equipment was added.
Every new conduit through the roof is a future leak unless a roofer flashes it. Log them all.
Drive times are from downtown San Antonio. Westover Hills and the Far West Side data center cluster are on our routes daily.
Pick an areaDrive times from downtown San Antonio.
Critical facility managers ask us these first. Something else? Call a project manager.
Yes. Work follows an approved MOP, with redundant protection below and every zone closed the same day.
Yes. We write methods of procedure and work only in approved windows.
Usually PVC or 80-mil TPO over a high-density cover board, or standing-seam metal on sloped roofs.
Galvalume steel in 24 or 22 gauge with PVDF paint covers most needs; aluminum is used near corrosive exposures.
Scheduled inspections, drain clearing and logging every penetration catch problems before water gets in.
In 2026, heavy-duty TPO or PVC roofs run about $12 to $20 per square foot, plus protection, escort and documentation costs.
Yes. Background checks, escorts and badges are handled before work starts.
Yes, before and after major storms, with reports.
Tell us about the facility. A project manager calls back within 2 business hours, or right away for an active leak.