Roofs built to carry solar · San Antonio, TX

Solar-Ready Roofing for San Antonio buildings

A roof designed to sit under a solar array for 25 years or more: structure checked, mounts flashed into the membrane, fire pathways laid out and a surface that will not need to come off under the panels. We build the roof and work hand in hand with your solar installer.

  • 25–40years under panels
  • +$1–$3per sq ft extra
  • $200+saved per panel

Plan a solar-ready roof

Under a minute. A project manager calls you back within 2 business hours.

Step 1 of 3

Service type
How urgent is it?

Fastest response: call (210) 384-6843. Or finish the form and we call you.

Used only to answer your request. Privacy.

Request received

  1. A project manager reviews your details and photos.
  2. We call you within 2 business hours.
  3. Water coming in? Call (210) 384-6843 now.

Prefer to talk? (210) 384-6843

Our solar-ready roofing services

The roof outlives one array only if it is planned with the array. That planning is our part of the job.

The roof under the array & how it attaches

Panels last 25 to 30 years. The roof under them should last at least that long and be easy to keep watertight.

Roofs under solar · bar = service life

  • Standing seam metal

    Clamps grip the seams, no holes. Outlasts two arrays.

  • 80-mil TPO or PVC

    Thick white sheet with protection pads under racking.

  • 3-ply modified bitumen

    Tough under foot traffic around the array.

  • Coating on old roof

    Only if the roof truly has 25 years left. Rarely the case.

How arrays attach

  • Ballasted racking

    Weighted frames on protection pads, few or no holes. Needs structural capacity for the ballast.

  • Flashed standoffs

    Posts bolted to the structure and flashed into the membrane by the roofer.

  • Seam clamps

    On standing seam metal, clamps grip the seams. No penetrations at all.

We use attachment parts the roof manufacturer approves, so the roof warranty stays in force under the array.

  • S-5!
  • OMG PowerGrip
  • Carlisle
  • GAF
  • Holcim Elevate

Solar-ready design rules

What we plan with your solar installer, engineer and the fire code before the first panel goes up.

Roof lifeAt least the life of the array, 25 to 30 years; replace older roofs first
StructureEngineer confirms dead load; ballasted racking often adds about 4 to 7 psf
WindRacking and ballast designed to ASCE 7 loads for the building
Fire accessClear pathways and setbacks around arrays, edges, hatches and vents per the fire code
AttachmentsManufacturer-approved flashed mounts or seam clamps; no pitch pans
ProtectionSlip sheets or pads under racking; walkway pads to inverters and combiner boxes
ConduitRun on supports and through flashed curbs, never laid loose on the membrane
DrainageArrays laid out so they do not block drains or trap water
WarrantyRoof warranty kept in force under the array with approved details

How we build a roof for solar

  1. 1

    Check the roof

    Age, moisture scan and remaining life, in writing, before any solar contract is signed.

  2. 2

    Plan with the installer

    Array layout, pathways, attachment type and conduit routes agreed on one drawing.

  3. 3

    Engineer the loads

    A structural engineer confirms the roof can carry the array, ballast and wind.

  4. 4

    Build the roof

    New roof installed with mounts, curbs and conduit penetrations flashed in as we go.

  5. 5

    Hand off to solar

    Your solar contractor installs the array on a finished, warrantied roof.

  6. 6

    Joint walk

    We walk the finished array together and record every penetration for the warranty file.

Solar-ready roofing | pros & cons

Pros

  • No paying to remove and reset panels mid-life
  • Leak-free mounts flashed by roofers
  • Roof and array warranties stay in force
  • White roofs reflect light that bifacial panels can use
  • One plan for roof, structure and fire code

Cons

  • Higher upfront cost than roofing alone
  • May mean replacing a roof with a few years left
  • Structural upgrades are sometimes needed
  • Roof areas under panels are harder to reach later
  • Takes coordination between roofer and solar installer

Is your roof ready for solar?

Five quick questions. No email, no form.

  1. Is it a standing seam metal roof in good shape?

  2. Is the current roof more than 10 years old?

  3. Does the roof leak now?

  4. Has an engineer confirmed it can carry the extra load?

  5. Do you plan to add solar within 3 years?

Your answer

Answer the questions

We will tell you honestly if another system fits better.

Get a free assessment

Solar-ready roof costs in San Antonio

2026 prices. A solar-ready roof is a normal re-roof plus the details below.

Solar-ready details on a new roof

+$1 – $3/ sq ft

On a 40,000 sq ft re-roof: about $40k – $120k extra

What moves the price

  • Membrane thickness or metal roof choice
  • Number of mounts and conduit penetrations
  • Protection pads and walkways
  • Structural reinforcement, if needed
  • Ballast weight and wind design
  • Coordination with the solar schedule
Run the cost calculatorYour size, layers and options in 60 seconds
ScenarioPrice
New TPO roof firstTear-off, R-25 insulation, per sq ft$9.50 – $14
80-mil membrane upgradePer sq ft+$1 – $2
Flashed solar mountEach, installed by roofers$100 – $300
Structural engineer reviewLetter and calculations$1,500 – $5,000
Remove & reset panelsPer panel, with the installer$200 – $300
Leak repair under arrayPer visit$650 – $3,500

Solar-ready roofing across greater San Antonio

We plan roofs for solar across CPS Energy’s territory and the New Braunfels Utilities area.

  • Northeast I-35
  • Port San Antonio
  • Brooks
  • Medical Center
  • Stone Oak
  • Alamo Ranch
  • Leon Valley
  • Live Oak & Converse
  • Schertz & Cibolo
  • Selma
  • New Braunfels
  • Boerne

Solar-ready roofing FAQ

Something else? Ask a project manager.

Should I replace my roof before installing solar?

If the roof is more than about 10 years old or leaks, usually yes. Panels last 25 to 30 years, and removing and resetting an array to re-roof later typically costs $200 to $300 per panel plus downtime.

Will solar panels void my roof warranty?

They can if the mounts are not approved by the roof manufacturer or are installed by someone else without notice. Using approved, roofer-flashed mounts and telling the manufacturer keeps the warranty in force.

What is the best roof under solar panels?

Standing seam metal, because clamps attach to the seams with no holes and the roof outlasts the array. For flat roofs, an 80-mil white TPO or PVC with protection pads under the racking.

Can my roof hold solar panels?

Many can, but it needs checking. Ballasted arrays commonly add about 4 to 7 pounds per square foot. A structural engineer confirms the capacity before the layout is final.

Are there solar incentives in San Antonio?

CPS Energy has offered commercial solar rebates for small businesses, schools and non-profits, and the federal commercial solar credit now has tight deadlines: projects that did not begin construction by July 4, 2026 generally must be in service by the end of 2027. Check current terms with CPS Energy and your tax advisor.

Do you install the solar panels?

No. We build and warranty the roof and flash every mount and penetration. Your solar contractor installs and wires the array, and we coordinate the schedule with them.

Free roof check for solar

We scan the roof for moisture, estimate its remaining life and send a written opinion your solar installer and lender can use.

  • Moisture scan and core cut
  • Remaining-life letter
  • Layout notes for your installer