Multi-ply asphalt roofs · San Antonio, TX

Modified Bitumen & BUR roofing in San Antonio

Two, three and four-ply asphalt roofs that take a beating: busy mechanical roofs, heavy foot traffic and older buildings with built-up roofs we repair, tie into or replace. Torch-free methods for occupied buildings.

  • 2–4plies of waterproofing
  • $11–$17per sq ft installed
  • 20 yrwarranties available

Get a mod-bit or BUR quote

Under a minute. A project manager calls you back within 2 business hours.

Step 1 of 3

Service type
How urgent is it?

Fastest response: call (210) 384-6843. Or finish the form and we call you.

Used only to answer your request. Privacy.

Request received

  1. A project manager reviews your details and photos.
  2. We call you within 2 business hours.
  3. Water coming in? Call (210) 384-6843 now.

Prefer to talk? (210) 384-6843

Our mod-bit & BUR services

Asphalt roofs are layered on purpose. We keep the layers working, or rebuild them when they cannot.

Systems & how the plies go down

More plies mean more redundancy. How they are bonded decides cost, odor and fire risk on your building.

System options · bar = typical life

  • SBS 2-ply

    Base sheet plus granulated cap. The common mod-bit roof on smaller buildings.

  • SBS 3-ply / hybrid

    Extra ply for heavy traffic and long life, often over a BUR base.

  • APP 2-ply

    Plastic-modified sheets, torch-applied. Good UV resistance.

  • BUR 4-ply, gravel

    Felts and hot asphalt with a gravel flood coat. Old-school and tough.

How the plies are bonded

  • Cold-applied adhesive

    Plies set in adhesive. No flame, no kettle, low odor. Our default on occupied buildings.

  • Self-adhered sheets

    Peel-and-stick base and cap sheets. Clean and fast on small and medium roofs.

  • Hot-mopped asphalt

    The traditional way for SBS and BUR. Strong bond; asphalt odor on the day of work.

We install multi-ply systems from manufacturers that warranty the whole assembly, including the insulation and adhesives.

  • GAF
  • Johns Manville
  • Siplast
  • Polyglass
  • CertainTeed

Modified bitumen & BUR specs

The numbers your architect, insurer or board will ask for.

Mod-bit sheetsSBS (ASTM D6164) or APP (ASTM D6222 / D6223), polyester or glass reinforced
BUR pliesGlass-fiber felts (ASTM D2178) in 3 or 4 plies with asphalt between
SurfacingWhite granule cap, gravel in a flood coat, or a reflective coating
BondingCold adhesive, self-adhered, hot asphalt, or torch (APP)
Minimum slope¼ in per foot
Cool roofWhite granule caps or coatings to meet the 2021 energy code reflectance
Fire ratingUL / FM Class A assemblies
Wind upliftFM-rated assemblies sized to ASCE 7 loads
Service life15 to 25 years for 2-ply mod-bit; 20 to 30 for 3-ply and 4-ply BUR

How we install a multi-ply roof

  1. 1

    Cores and survey

    Core cuts show how many layers and what is wet, so the bid matches the roof.

  2. 2

    Tear off by the day

    Only what we can close by evening is opened; the deck is checked and repaired.

  3. 3

    Insulation and slope

    Polyiso and tapered crickets to drains, with a cover board for the plies.

  4. 4

    Base and interplies

    Sheets laid with staggered laps, each one bonded fully, no voids.

  5. 5

    Cap sheet and flashings

    Granulated cap, then two-ply reinforced flashings at walls and curbs.

  6. 6

    Inspect and surface

    Every lap probed; white cap or coating finished; manufacturer sign-off.

Mod-bit & BUR pros & cons

Pros

  • Multiple plies: one cut does not mean a leak
  • Tough under foot traffic and dropped tools
  • Ties easily into existing asphalt roofs
  • Repairs are simple and familiar to any crew
  • Torch-free options for occupied buildings

Cons

  • Heavier and slower to install than single-ply
  • Dark surfaces get very hot unless capped white
  • Hot asphalt has an odor on install days
  • Torch work carries fire risk; we avoid it near wood
  • Granules wear and seams age faster in our sun

Is mod-bit or BUR right for your roof?

Five quick questions. No email, no form.

  1. Does kitchen grease or chemical exhaust land on the roof?

  2. Do service techs walk the roof every week?

  3. Is the current roof built-up or modified bitumen?

  4. Must the work be done with no open flame?

  5. Is hail damage a major worry?

Your answer

Answer the questions

We will tell you honestly if another system fits better.

Get a free assessment

Mod-bit & BUR costs in San Antonio

2026 installed prices per square foot with one layer torn off and code insulation, unless noted.

Typical 2-ply SBS replacement

$11 – $14/ sq ft

A 20,000 sq ft roof: about $220k – $280k

What moves the price

  • Number of plies and how they are bonded
  • Old layers and gravel to remove
  • Wet insulation and deck repairs
  • Tapered insulation for ponding
  • White cap sheet or coating
  • Rooftop units and penetrations
Run the cost calculatorYour size, layers and options in 60 seconds
ScenarioPer sq ft
Repair, one visitBlisters, laps, flashings$500 – $3,000
2-ply recoverOver one sound roof, no tear-off$8 – $11
2-ply SBS, tear-offR-25 insulation$11 – $14
3-ply SBS or hybridHeavy traffic, longest life$13 – $16.50
4-ply BUR with gravelHot-mopped, flood coat$12 – $17
White cap or coatingAdded for reflectance+$0.50 – $1.50

Mod-bit & BUR roofing across greater San Antonio

Many of the city’s older commercial buildings still carry built-up roofs. We reach them the same day inside Loop 410.

  • Downtown
  • Medical Center
  • Airport area
  • Northeast I-35
  • South Side
  • Brooks
  • Port San Antonio
  • Windcrest
  • Live Oak & Converse
  • Universal City
  • Kirby
  • Leon Valley

Modified bitumen & BUR FAQ

Something else? Ask a project manager.

How much does modified bitumen roofing cost in San Antonio?

In 2026 a 2-ply SBS modified bitumen replacement with tear-off and code insulation costs about $11 to $14 per square foot. Three-ply systems run about $13 to $16.50, and a 2-ply recover over one sound roof about $8 to $11.

What is the difference between modified bitumen and built-up roofing?

Built-up roofing (BUR) is made of several felt plies laid in hot asphalt, usually topped with gravel. Modified bitumen uses factory-made sheets of rubber- or plastic-modified asphalt, so fewer plies are needed and it installs faster.

Is torch-applied roofing safe?

Torch work is a known fire risk, especially near wood blocking and in tight corners. We prefer cold-applied or self-adhered sheets on occupied buildings and only torch where it is allowed, with a fire watch kept after work ends.

How long does a modified bitumen roof last?

About 15 to 25 years for a 2-ply system and longer for 3-ply. A white cap sheet or coating helps a lot in San Antonio, because heat and UV age asphalt faster than in milder climates.

Can you repair an old built-up roof?

Yes. We cut out blisters, re-flash walls and curbs and patch with compatible plies. If core cuts show the insulation is dry, a coating or a mod-bit recover can extend its life without a tear-off.

Is mod-bit or TPO better?

TPO usually costs less and stays cooler. Mod-bit wins where there is heavy foot traffic, lots of rooftop equipment or an existing asphalt roof to tie into. We price both when either could work.

Free multi-ply roof assessment

We cut cores, check every lap and flashing, scan for wet insulation and send a photo report with repair, recover and replace prices.

  • Core cuts and moisture scan
  • Lap and flashing check
  • Fixed written prices within 48 hours